Meanwhile, I went to the Daltile place and picked up most of the bathroom tile, all except the basement's floor tile- that'll come on the 18th. The tile I did bring home is now stacked up in Kian's room ready and waiting for Steve to start the installation.
And as Pete's working his way through the basement drywall, he started putting in the framing for the under-stairs cubby hole, where there'll be a small bookshelf that I picked up from Ikea on Sunday.
And the insulation guys installed the rigid polyisocyanurte on the crawlspace concrete walls, including a medium density spray foam over the sole plate to ensure a nice tight seal. It'll be cozy warm in the Kayak Storage Facility for sure now. All that's left for them to do is the extra attic insulation that'll be blown in on Monday. (Remember? I have to finish pulling all that cable by then....will I make it? BottleRockit has a rare mid-day gig on Sunday, a repeat appearance at a beach house on Lake Goodwin by Kayak Point. That'll get in the way of finishing the cable running. I guess I may have to take some time off on Friday.
Red letter day for tennis tonight by the way- Midori and I beat John and Barbara for the first time. John is like a 4.5; Midori and I are like maybe 3.0 on a good day, something less than that usually. So taking a set against John felt, well, pretty darn awesome.
That's it for now- all coming to you from the blackberry tonight; left the laptop at the office. C
_________________________________________________
This message is private or privileged. If
you are not the person for whom this message
is intended, please delete it, notify me
immediately, and do not copy or send this
message to anyone else.