Even though it rained most of the day, apparently Steve was able to get enough dry moments to finish the main surface of the back deck today! It looks totally awesome, and I had to open the Nanawall to get the full effect of the inside/outside union. I think H will be very happy.
I also picked up the cork flooring for the kitchen today on my lunch break, from Ecohaus. They gave me a nice professional discount with it, and was able to walk away with the last 5 boxes they had on site. So maybe Pete can get cranking on that soon.
It's exactly four weeks to October 31 today. That's four more weekends. Tomorrow and Sunday will be all about painting. I think Pete will finish off the woodwork upstairs tomorrow, and then will shift into building the kitchen cabinets. I need to get moving on the electrical work with Darren (he hasn't called this week), and Steve will be doing siding outside probably most of the week. It's going to be very busy here soon, and I may have to do the full week off work in a week or two just to focus on making it all happen.
Stay tuned; this is where it gets interesting.