Sure enough, Steve finished the installation of the
Kayak Storage Facility door, with the same key as the basement door. How convenient. Next step in that crawlspace is to put the insulation layer underneath the joists. I bought it a couple weeks ago but have been too focused on painting to do that work so far. After that, I'll put in a duplex outlet, two three-way switches, and plug in my halogen light. And then Kian's old go-kart's wheels will wind up being the kayak guides. That's a project unto itself.

It didn't look like Pete had stopped by today, until I poked around in the basement and noticed that yet one more layer of Duram's Fix-All had been layed down on the floor again in various patches in preparation for the bamboo floor that we need to order soon. All this stuff here and there that no one will ever see, but takes time and extraordinary effort. This simple little 96 square foot addition really has had a lot of hidden required efforts.
But it's all good. And soon - five weeks from now - we should be back in the old homestead. That'll be here before we know it. Well, I'll just keep on telling myself that anyway.