Wednesday, September 10, 2008

Ninja Cable Runner

I got up at oh-dark-thirty this morning (5:30AM) to sneak over under cover of darkness and put the Cat-5 cable where it needed to go. First thing I did was open all the exterior doors to vent out all that toxicity. Then I opened the skylight and windows. The air was thick with chemicals. The heat was on, too, so when I went into the Heather Murchison Kayak Storage Facility, it was pretty cozy and warm. The kayak will be very happy there. Incidentally, the insulation guys are putting in the rigid insulation in that space today!

Steve (bless his heart) pre-drilled the cable holes for me per our discussion yesterday, and even put in a 1/2" copper pipe to show me where the hole was to run the cable from the Kayak Storage Facility into the floor framing. It was almost easy. I ended up making I think 6 in-and-out trips to and from the crawlspace in order to start the cable pull, then pull it back due to a knot, restart it, then pull it back for incorrect routing reasons on the pull side (too close to the light fixtures, underneath the insulation instead of over it, etc. But in the end, I accomplished the Ninja Cable Mission by 7:20, after which I went home to shower and head off to work.

Ikea order is ready to be placed; maybe later today. We'll see. I have this weekend to run the cable in the ceiling. On Monday, the insulation guys come back to blow mass quantities of insulation into the attic. It'll be like a blizzard hit it, only it'll be all fluffy and warm instead of freezing and wet.

No comments: