Sunday, November 9, 2008
Nice Truck, Great Help!
We're in!
Saturday, November 8, 2008
Moving Day Eve!!!

This is our last night in the rental house, I have a couple friends lined up (Peter K and John H) to help us move the big furniture items tomorrow afternoon, and we'll be sleeping in the nice warm house tomorrow!
Pete finished all the shelves in the living room yesterday - here's what the Living Room looks like today, ready for more books! I have a hunch we'll actually not fill the shelves with books yet, but we'll see. It would be a shame to move in and have them full from Day 1, eh? We'll see, of course.
Steve installed all the miscellaneous "jewelry" in the main bathroom yesterday; looks pretty crowded in this cell phone photo, but it's pretty cool in real life.
and to the left, outside of the picture, is another "Billy" Ikea shelf, for towel storage. Funny thing about that sink - it's the second cheapest thing in the house, at $39. The faucet was about 4 - 5 times that. Oy! That' the part you touch and interact with, so we rationalized that was the critical thing to get right. And check out that Toto toilet (it's not in Kansas anymore.) Heather spent about three hours sealing all the grout in that room today - and the tile (as I'm sure you recall) goes all the way around, about 7 feet high. Whew! That was quite a job. On Thursday, I was there for a momentous occasion, akin to the Promontory Utah event I'm sure you all know about. The very last piece of siding was installed at 11:27 AM by one Steve Rankin, above the outdoor light sconce just south of Nanawall. Small pic is Steve air-nailing it into place.


And today, Pete put in a full day along with us, finishing the closet door installations in Kian and Daniel's room, and putting down the baseboards in the closets (so we can pile them full of storage tomorrow and not have to worry about doing them later), and the bed walls (for similar reasons).
Friday, November 7, 2008
Move In Day Is Here
What a week! After the election Tuesday, I went into the office for an 8:00 meeting and then it's been work on the house almost constantly since then. Ray finished hooking up the rest of the plumbing on Wednesday, and I'll be darned if I wasn't real glad I was there to see it before he left. He had placed the overflow for the water heater on the back side, so that if there ever was a leak, it would go into the baseboard and start rotting out the drywall. Sheesh. "That's where the connection was aimed, so I just went that way" he said. I asked him nicely to put it in the front, lie next to the floor drain and away from the wall. My goodness, one really needs to be careful.
Sunday, November 2, 2008
Did We Move in!?!?!?!?
For the first time in a really long while, I brought a decent camera to the remodel instead of just relying on the cell phone camera.Here's a pop at the new entry; do you like all the wood? The walls on both sides of the front door will be clear T&G cedar too, so it'll be all woodsy warm when you come to the front door. (If you're an evironmentalist, it'll be all old growth too, but fortunately there's not much of it.) Can we move in like this? You betcha.
Here's the main floor bathroom now; I powered up the Tech Lighting fixtures today and popped in the GFI outlet and got the fan running, cleaned up the tub, and tested out the Hans Grohe shower. Awsome. Can we move in like that? Well, kind of - just need the shower curtain.
I powered up the water heater today too. That little snake from the ceiling to the heater is 10 gage armored cable, baby. I turned it on and could hear the water warming up and expanding the chamber. Can we move in like that? Well, not quite. If you look at the photo, the piping that gets the hot water to the tubs and sinks isn't there yet. So, no; can't move in until we have hot water.
And here's a shot at the most pesky circuit I'm trying to figure out. If you come to the open house on the 15th, hopefully it'll all be figured out by then and you won't accidentally electrocute yourself like I almost did. Just kidding!!!
Saturday, November 1, 2008
Ever have one of those days?
And then you go to the other store that has it all and you finally get what you need but you get home and you're still missing a critical part? So you go get the missing piece, and it's small so you just put it in your pocket and you get home and find that somewhere between the store and your house it fell through a hole you didn't know you had? So you have to go again to the store to get a replacement, so you're finally ready to get 'er done, but when you put the "industry standard" pieces together they don't fit right because another piece is missing? How about when you get that part and finally are just about to finish, and something really basic is missing because you never thought what you alreday had wouldn't work, like wire nuts being too small for instance?
Not me- I never have days like that. Not! Argh- I'm having a buffalo burger w/bacon and cheese at the ale house now. I'll get back to the project in a few minutes. :-)
_________________________________________________
This message is private or privileged. If
you are not the person for whom this message
is intended, please delete it, notify me
immediately, and do not copy or send this
message to anyone else.
Friday, October 31, 2008
Bill Gates
_________________________________________________
This message is private or privileged. If
you are not the person for whom this message
is intended, please delete it, notify me
immediately, and do not copy or send this
message to anyone else.
Thursday, October 30, 2008
Soooooo Close..........
Just a couple of lunchtime photos. Tom the Flooring Guy put the second coat down this morning about 8:30 - he's coming back after lunch to do the third and final coat. I hope it's nice and thick.

Wednesday, October 29, 2008
Plastic Laminate Looks Great!!!
The plastic laminate is on the countertop and the drop-in sink and cooktop are - uh - dropped in. I need to get a better camera this weekend and take some decent shots that actually show something more than impressionist images, huh?That's the diswasher on the left side there, Ray wasn't able to get anything done in the kitchen yet, just the main bathroom toilet, the sink is hung but not plumbed, and the shower fittings are started.
The pair of light fixtures in the bathroom are from Tech Lighting; they are the most solidly built well designed light fixtures I've ever installed. Lots of room for wiring, lots of screw holes for varied boxes, and solid metal componentry. They were pretty pricey though. The diffusers still aren't on there, but I'll do that this weekend.
Steve did siding on the rest of the bedroom wall today too, so he's working his way around. What's kind of funny is that when he started, the way he talked I thought he'd be done with siding in a couple of days. It's been weeks. There's always been something else to do, like the tile in the utility room, or the countertop, or the grouting.Tuesday, October 28, 2008
What's That Column?


And because I wasn't able to get a picture of the siding progress yesterday, I shot it today while there during lunch.
Monday, October 27, 2008
Counting Down? How About T Minus 5 Days?!?

Ray the Plumber will be here tomorrow, getting the washing machine, water heater, and basement bathroom. Steve is supposed to be doing the plastic laminate for the kitchen counter tomorrow (I picked it up today!), so that Ray can put in the kitchen sink on Wednesday, along with the toilet, sink, and shower in the main floor bathroom. (Note I said sink as in singular sink when referring to the kitchen, not big sink and small sink.)Sunday, October 26, 2008
Sunday, One Week Left!

Pete almost made it all the way through the basement with the flooring yesterday, Saturday. Here's a peek into Kian's through the man cave.
Today, Heather finished painting her office and the main floor bathroom, moved a bunch of dirt into the planter in the front, and did a ton of cleanup while I focused on the electrical in the main entry, finishing the day with getting the master bedroom and Kian's bedroom all fully electrified.
The circuiting for the basement hallway lights around the stairs is driving my nuts. I can't figure out how the power is supposed to get to the lamps, and I tripped the breaker three times trying to get it figured out. I may need to call in Sparky for this last one. I did however get the main entry 4-way light working, and the upper floor hallway lights too. Entry light is good. Gettin' there. One week left. We're on about the same schedule as the election.
Saturday, October 25, 2008
Saturday, one week to go. Baby.
How do you like the modern austerity of the barren stair detail we got going? How about the red carpet treatment that Pete has on the floor?
That red stuff is actually the rubber pad with the little beads underneath for moisture to escape. Cool stuff. The stair is sheathed with Pete quality drywall on the underside, the sides are going to have some nice VG fir trim soon. What goes on top of the red stuff is the engineered bamboo flooring, which pretty much just floats on the top of it, with glued tongue and groove joints. Here's Danny's room with the stuff all layed down looking pretty finished. Pete arrived about 1:00 today; not sure how far he got but will see soon.Danny helped out today, moving dirt from the back yard to the front, helping to fill out those planters in the front. Looking good!!
Friday, October 24, 2008
Friday Morning Update

The tile needed to be fairly small because of the irregularities in the floor, so I got a 3"x6", and it's porcelain so it's very dense and durable. Looks like travartine though. Thursday, October 23, 2008
Billy Shelves Going In

Ikea calls them " Billy". Bookshelves. We picked up a boatload of them last week, and Pete is putting them in place, beteen the carefully dimensioned and crafted walls so they'll fit like a glove. The beech wood color is the perfect foil for the flowering herbs wall color. What's that on the shelves you're wondering? Those tubular things? That's the glue for the wood flooring that's also going down tomorrow and Saturday.
We are entering our last week of construction craziness. On Monday and Tuesday, Ray the Plumber will be coming to install the showers, sinks, and faucets in both bathrooms, along with the water heater. If the plastic laminated arrives on Tuesday the way it's supposed to, Ray puts in the kitchen sink on Wednesday. (What are the chances, right?) We'll see....
Tom Le the flooring guy is supposed to come Friday, maybe Thursday and Friday both, to put the last two coats on the oak floor. Then we start moving in over next weekend, November 1 and 2. Whew; it's going to be down to the wire totally on everything. There will definitely be some stuff undone, that we'll just have to get to as soon as we can. (As if we will still have all the energy; this has been exhausting and stressful, but we need to keep the momentum up.)
Can't wait to sleep in a house that's finally warm for goodness sake.
Tuesday, October 21, 2008
Monday, October 20, 2008
Monday Catchup
There's the Kitchen "before" view on the left, taken on June 4, and the current view is below, taken from about the same location. Not much different, are they? Maybe when all the finishes are in you'll notice it more. I ordered the wall tile the other day for the backsplash - it arrives maybe October 29, just before we start moving in. Down to the wire, baby.Notice something else? There's built in lighting again for the first time, too! Dishwasher still needs to go in,
the doors on the sink front won't go in until the sink goes in, which can't go in until the plastic laminate arrives, knee bone connected to the hip bone, etc. The trim in the picture isn't blue by the way - just a peculiarity of the lighting.Steve's preparing to put down the flooring in the utility room too; here's a shot of the Central Plant in the cleanest condition it's ever been. Washing machine and dryer are moved temporarily out into the media room. And dig the light fixture in there too! You can tell, I've been busy, and Darren helped almost all day Saturday. Hence all the progress.


Lastly, the much ballyhooed and long awaited pull-out pantry has been partially installed today

Here it is with three of the four pull out shelves in the partially pulled-out position. Seems like a lot of shelves, for some short things I guess. We'll have to probably reconfigure it a time or two before we can consider it optimal.
Sunday, October 19, 2008
Where've I Been?
On Thursday evening, there was no post because Heather and I went to the final dress rehearsal of a new play at the ACT Theater, commissioned by a friend of mine as a birthday present for his wife. It's called "Becky's New Car", and Charlie Staadecker of Staadecker Real Estate presented it to his wife Bonita, (whom Heather decided she wants her to be her mommy) at a very heartwarming ceremony full of love and humor, and of course, suggestions that more people do the same thing. VERY funny play; we are going to go see it maybe with the Quacks soon- highly recommend seeing it.
But we got home very late and no post that night.
Then on Friday, I took the day off and did loads and loads of electrical work all day long until fairly late, after which Heather and I went to get something to eat fairly late, after which I just crashed, and then got up early on Saturday to do more electrical work, but I also started a new blog that took my morning time instead of this one.
It's called Election Haikus for Starbuck Cards. Why not? Win a $5 Starbucks card and get in the drawing for the big one.
So here it is, Sunday, and H and I need to head for Ikea to get all the bookshelves so Pete can install them next week. Sounds like the flooring guy can come in at the end of the week and get that done, the walls in front are done to the point that Steve can pour the stoop maybe tomorrow if the weather holds, and we're in good shape for the big move coming up. Yah sure you betcha!













