
The tile needed to be fairly small because of the irregularities in the floor, so I got a 3"x6", and it's porcelain so it's very dense and durable. Looks like travartine though. Phase 2 of Our Adventure In Home Improvement
(Part of Phase 1 still exists at: http://www.facebook.com/minifeed.php?id=686174706 !!!!

The tile needed to be fairly small because of the irregularities in the floor, so I got a 3"x6", and it's porcelain so it's very dense and durable. Looks like travartine though. 
There's the Kitchen "before" view on the left, taken on June 4, and the current view is below, taken from about the same location. Not much different, are they? Maybe when all the finishes are in you'll notice it more. I ordered the wall tile the other day for the backsplash - it arrives maybe October 29, just before we start moving in. Down to the wire, baby.
the doors on the sink front won't go in until the sink goes in, which can't go in until the plastic laminate arrives, knee bone connected to the hip bone, etc. The trim in the picture isn't blue by the way - just a peculiarity of the lighting.


Pete installed the oven in the wall cabinet! You can even see the LED timer is on now. It's just the right height that we don't have to bend over to see if anything's ready yet, too. Don't have to the bendover to check on the turnovers.
Actually, it's more of an early 21st century international home style pattern (aka Ikea pattern). Again; it's one baby step closer to kitchendom.
And the closet doors from Home Depot finally arrived today; I ordered them way back on September 19, and they had to come all the way from Oregon. 3 1/2 weeks and they look like they were assembled in haste. I'm a bit disappointed, but I also don't think most people will notice. I ordered three more doors for the basement from the same people. At any rate, Pete got one half of the entry closet installed; Heather's closet doors go in tomorrow perhaps. Then it's kitchen flooring time!!!
The weather surprised us with more sunshine for the most part today; Steve thought it was going to be a day of inside work, but he focused on two big outdoor projects instead. First item; more siding, on the south side mostly, but also by the basement door and Danny's man-cave. The second item was the shuffling of the massive amount of concrete block for the planter walls. No picture, but there's lots of block. Two pallettes worth. And of course, it wouldn't be an outside day without more dirt being moved; he also dug a trench for the footing of more of the block walls. Gonna look good I tell you...
And while Pete continued to make progress on the kitchen, mostly bit-by-bit, the bamboo flooring also showed up today. It's all in Danny's man-cave now getting acclimatized, though I don't know how effective that is when it's still in the plastic in the box it came in. Hmm..
Yesterday I mentioned that we turned the first lights on in the basement, but hadn't posted a picture for proof, so you might have thought I was just pulling your leg. Not so. here's the north wall of the media room, the big screen will someday be plugged into that outlet on the left wall there. I was thinking the recessed area around it should be painted black so that the screen just pops if you know what I mean, but the editorial board so far says no. Stay tuned.
And that glowing hatbox in last night's pics; here's a small closeup of it. My tennis buddy Barbara says "mid century modern, huh?" Well; yup. It's still got the plastic wrap around it too, which really makes it authentic for me because my mom kept the plastic on her mid century modern lamps forever, back in those days when it was just modern and the year 2008 was considered Jetsons territory.
Pete's been cranking away at the kitchen cabinets; today he was able to install some of the drawers and cabinet doors. The hardware is pretty cool; it's got dampers so you can't slam the doors and drawers shut; they close slowly on their own, nice and quietly. Saves wear and tear on the assembly, and keeps the noise down. Very cool.
So here's a peek at what the kitchen looks like from the new dining room; (the color's washed out because I was standing next to the hatbox).Heather's hatbox is successfully suspended above the future dining table now- all three-way switched and everything. Starting to look like a Sunset Magazine photo, huh?
Our friends Darren and Charl came in all the way from the Sammamish Plateau yesterday so Darren could help me get electrical work started. We spent three hours trying to figure out how Sparky had the place set up to work, and ended up only able to get Heather's Hatbox mounted and glowing. Looks great. I'm just wondering how many times we're all going to bonk our heads on it before the table is put into place. The count is two at the moment; wait 'til Steve and Pete show up tomorrow.
This morning, we found some #*&%@~$ egged the house. A half dozen or so, splattered the living room window and Tyvek walls. Unbelievable. So we lost a few hours today while Heather had to get some cleaning supplies and get everything all mopped up. Dang.
And today, I was able to turn the living room lights into a 3-way switched group, and then I moved to the basement where I hung Kian's bedroom light and the man-cave light, and yesterday I put in all the recessed MR16 wall washers and got the ones in the media room working today. (Another 3-way group!) Also got all the media room outlets installed and plated, along with the quads in the man-cave, though they aren't all powered yet.
Tuesday Darren is supposed to come into town again to work with me, we have some four-way guys to do, and in general find a lot of power because some of the places Sparky has the power running aren't quite easy to find. Hmmm...
That's it for now; another long weekend, including the Sunrise Heights gig last night, and then it's back to work in the morning. Oy!
Cial!
And why not? That's his handiwork all over - the wall cabinet is on the wall, the base cabinets are all where they're supposed to be, and it all fits like a cozy pair of socks. It's looking good. That gave us the opportunity to measure for the plastic laminate. Looks like a 4x12 and a 4x10 sheet together would do the job, with two joints. (Those joints are always butt ugly; they need to be where the counter is short, like between the front of the sink and the edge of the counter, not in the middle of the six foot long and three foot wide peninsula.)
He was late arriving, due to the need to purchase the wood for wrapping the column at the front entrance, so we had a chance to review that as well. The one column turned out to need about $400 of pre-primed trim. Holy Moses! Good thing there's only one of those on the front of the house! Now I need to seriously think about doing that on the back of the house for the trellis. Maybe not!
But then again- it might be the right thing to do....
Hey! It's almost looking like a kitchen today!!! The unpleasant skies of October maintained their drippy 'tude all day, so there wasn't much in the way of outdoor improvements when I finally came be in the evening. Steve did manage to get the Trex decking onto almost all the treads and the lower two supersteps, but I wasn't able to pick up much of anything else outside.
So Pete sent me down to Ikea today to pick up the two missing pieces that didn't come with the big order - the cabinet above the refrigerator, and the drawer front panels for the unit under the peninsula.
Gee; guess what we did this weekend! We painted, then we painted some more, and after that we shopped for more paint and painting supplies, then we painted again until we got tired of it, so we ate dinner and slept and painted again just to make sure we wouldn't forget how much we love painting. This shot of H in Kian's Man-Cave was early on Saturday, after I had cut in and painted the ceiling and wall tops. She gets the less body-twisting jobs of rolling on the walls. (The white is primer, the yellow is the paint.)

It was the annual Single Malt Golf Tour, the 13th edition. (Check out my boss, exercising the time honored tradition of savoring every drop of single malt.) This year it was the Bend, Oregon area. We were there three years ago on a fabulous trip, and the spectacularly beautiful Aspen Lakes course was included in this year's trip too. This last photo is from this morning, sent by Andrew from Lost Tracks. Looks like another great trip.
Even though it rained most of the day, apparently Steve was able to get enough dry moments to finish the main surface of the back deck today! It looks totally awesome, and I had to open the Nanawall to get the full effect of the inside/outside union. I think H will be very happy.
I also picked up the cork flooring for the kitchen today on my lunch break, from Ecohaus. They gave me a nice professional discount with it, and was able to walk away with the last 5 boxes they had on site. So maybe Pete can get cranking on that soon.
It's exactly four weeks to October 31 today. That's four more weekends. Tomorrow and Sunday will be all about painting. I think Pete will finish off the woodwork upstairs tomorrow, and then will shift into building the kitchen cabinets. I need to get moving on the electrical work with Darren (he hasn't called this week), and Steve will be doing siding outside probably most of the week. It's going to be very busy here soon, and I may have to do the full week off work in a week or two just to focus on making it all happen.
Stay tuned; this is where it gets interesting.
And, as is the case in this Tale of Two Brothers adventure, while Steve's outside, Pete's inside doing finish carpentry around the windows, adding the casings and sills. It looks like he almost has enough of the old stuff saved to do the entire upper floor, and we'll switch to a more modern look in the basement I think. I'll have to check that out with the boss to be sure.
First, be advised that I am still sick, pretty much as a dog, but our landlord insisted on showing the place today, so I had to leave for that, and I had to be at Danny's doctor's office at 2PM for a joint meeting with his mom. So on the way, I dropped by the house. Of course.
I guess Steve's just used to that, and what he's come up with to deal with it is just a big fat piece of wood (in this case a 2x12), carefully scribed and cut and routed out in back for the unistrut, to conceal all of Sparky's handiwork. If you look carefully at the closeup photo, Steve was pretty accurate with the cutting along the scribe - he even accounted for the metal bands and escutcheon plate. The left side 2x12 will go on tomorrow, and it'll all be caulked nice and neat when he's done.
So at the end of the day, it'll look like it's embedded neatly in the exterior skin of the house. Maybe that was intentional and I should just hush!!
Another issue the Bros have been trying to deal with is that there's a big bump in the concrete floor where the old garage floor was sloped up for drainage and we took out the wall between the garage and the rest of the basement. It's right in front of Daniel's bedroom door and the basement bathroom door. The wood flooring just won't go on there well without maybe trying to bend it, but it'll either crack or flex all the time, and in general be a problem. Grinding it all down right now would be a real difficult and troublesome thing, take a long time (read $$$), and something the Bros don't want to do very much. So we have to do something else there than the bamboo floor. That's all there is to it. It is what it is, as they say. After the doctor appointment, I tried Seattle Tile to see if there's any good rectangular floor tile with a bamboo like color or texture that could work. That would be better than carpet or vinyl or marmoleum, that's for sure. Jury's still out.
The little white balls are attached permanently to a red rubber vapor barrier, and it's an underlayment for wood floors being placed over concrete. Hallelujah - I've been looking for something like this ever since the guy at the wood-floor-over-concrete-seminar I went to said you need this kind of thing if you're putting wood floor in a basement. I got 700 square feet of it. Yee ha. No light fixtures though. They hurt my eyes.
Looks like he's prepping for a paint job here pretty soon. I wonder if they'll ask us over to view brush-outs of the various colors they're thinking of using like we did with them last year.
and stopped by the house on the way to see what got done. Took the opportunity to shoot maybe the last pic of the back of the house before the siding and the decking go on - they arrive tomorrow.
Kayak Storage Facility door, with the same key as the basement door. How convenient. Next step in that crawlspace is to put the insulation layer underneath the joists. I bought it a couple weeks ago but have been too focused on painting to do that work so far. After that, I'll put in a duplex outlet, two three-way switches, and plug in my halogen light. And then Kian's old go-kart's wheels will wind up being the kayak guides. That's a project unto itself.
