


Phase 2 of Our Adventure In Home Improvement
(Part of Phase 1 still exists at: http://www.facebook.com/minifeed.php?id=686174706 !!!!



_________________________________________________
This message is private or privileged. If
you are not the person for whom this message
is intended, please delete it, notify me
immediately, and do not copy or send this
message to anyone else.
By the time I got home in the evening, Steve had done quite a bit. He's fast.
And tonight being Thursday, the newly established tradition of the weekly visit to Tempero do Brasil occurred again, much to my personal delight. I'm working my way through the menu, and tonight it was Camarao Alho Oleo, which actually has tildees all over it so it's not really spelled corrctly here, but it's shrimp with garlic and olive oil, and it was fabulous. Heather had what's become the "Heather Plate", consisting of Bolinho de Bacalhau, collard greens, rice, beans, and manioc flour with *bacon*, and you know how I feel about bacon. Yum.
Regarding the stairs, Heather and I had one of those discussions last night as she finally started to understand the nature of the deck and stairs that I had designed. She took issue with their proximity and what would be between them. I, in my architecture focused brain, just thought we could do a Monty Python shrubbery between them. Once Heather saw the installation, she thought it would be better to make one of those big wide stairs that turn the corner. They look like the plinth at the Parthenon or Temple of Zeus; in this case there'd be seven steps.
So to further the discussion (we needed to get to a conclusion on this), I started drawing what that would look like on the butcher paper on the floor that's covering the wood floor, and a second sketch showing what I had planned. (Click on photo left.)
We ended up concluding that the conjoined stairs would be good, but instead of standard width stair treads, we'd skip every other riser and make wider treads, so they'd be a good size to hold potted plants and also serve as a bench. I left Steve a note on the plans "STEVE; LOOK AT THE DRAWING ON THE FLOOR!" It actually took him a couple hours to notice it; I got his voicemail that he understood it fine sometime around 10:30AM.
doghouse is the dishwasher that was finally delivered today. And this last photo is the little extra piece of sheetrock that Steve put around the opening to the stairs that I asked for - it allows the wall paint to turn the corner and stop so the ceiling color can start.
He worked a lot on the drywall around the stair today, and there you have it.
Viewing from the side, you can see that the eave projection covers the Nanawall well. The elongated posts will support the trellis that will extend the roof line out over the deck.But it had to be done this weekend, so I set the alarm for 5:45. To beat the heat, I planned to get there at 6:00 AM, before the sun comes up and starts to warm it all up. I don't have a haz-mat bunny suit, so I donned a turtleneck and cotton sweats with my hiking boots. (Stylish!). I had the heavy duty breathing mask, too, though I opted to not go for the full respirator. To top off my head, I had the LL Bean integral headlight cap- what a fabulous piece of gear. It worked perfectly; didn't need the flashlight.
I had purchased some knee pads a couple weeks ago to do the waterproofing installation, so I climbed up there "armed" ("kneed") to the teeth with those, and started the crabwalk through the darkness. The access hatch is right next to the new skylight, which was lined at my request with R-30 batts, which are almost a foot thick. I couldn't get around ot without rubbing my whole body against the batts, so I just pulled them all out so I could get where I needed to go.
As I rounded the corner, my headlamps shone on the massive tangled pile of blue cable lying on top of the insulation over the new entry closet. What a pile of spaghetti. So I tangled and twisted my limbs around midst the roof jacks, joist tops, and collar ties just to untangle all the cable so I could separate the three strand that need to go to three different locations. that took a little while, but all in all less than I thought. And fortunately, the knee pads were doing their job pretty well, and I found that I could sit comfortably on the big vent pipe that Ray the Plumber had put up there way back in June.
Once untangled, cable number one had to be poked down into the stud cavity by the new wall oven. The two speaker cables I poked up there a few weeks ago indicated the exact location I needed to poke through with this one. The building code today requires that any hole into the attic be plugged up with insulation, to prevent hot gases from getting into the attic space in case of fire. To pass inspection, Pete had filled up all the cable holes with a spray foam stuff that I now needed to somehow open up for the new cable. And I didn't have anything to poke at it with. So I manipulated the speaker wires that were in the hole, moving them around from side to side, trying to enlarge the hole, and I eventually was able to poke it on through, without too much effort. One down, two to go.
The next one was going to be a challenge. It was right next to the skylight shaft, and the framing at its base for some reason was double studs thick, and I knew from running the cabe before that I couldn't come down in the same spot as the existing ones because those turn sideways, go through another stud, before ending up at the electrical box. Now that the walls are all covered up below, that wouldn'r be possible. So I had to guess- and cross my fingers- that the place I think I needed to drill a new hole would actually be in the right place. (I did that once before in my previous house and ended up drilling into a camera bag that was in my closet!). This time, I lucked out. The drill I brought up went through the double studs like a hot knife through butter, it didn't feel like I hit anything nasty, and I poked the cable through into what I hoped would be the spot right above the targeted electrical box. I had to wait to see how close I came once I poked the third cable through.
Third cable, no problem, and by then I had the hang of crab-walking from joist to joist. No poke-throughs with my feet, and as I exited the space, I replaced the R-30 batts on the skylight shaft.
The trick really came down to whether or not I could actually get the cable all the way into the wall box - especially the one by the skylight. The others all had some accessibility from an unfinished back wall- but that one was totally enclosed. So I unwound all the cable already in the box and snapped open one of the prts in the back, and there it was - just sitting there like I had planned it and executed it like a pro. I used my fish tape to snag it in a matter of seconds, pulled it through the port, and all became right with the world. All wired up for sound; now all we have to do is find the money to buy the components!
Most of this was written at the Majestic Bay Theater while waiting for the new Coen Brothers' movie to start- all of it on bberry. My thumbs are sore. ;-)
They got everything selected, from paint colors to the additon of grasscloth to our palette, and a change to the kitchen tile countertop laminate! (Good think I didn't order those yet!) It's going to be beautiful.
(Another post directly from email right after shooting the shot.)
Meanwhile, I went to the Daltile place and picked up most of the bathroom tile, all except the basement's floor tile- that'll come on the 18th. The tile I did bring home is now stacked up in Kian's room ready and waiting for Steve to start the installation.
And as Pete's working his way through the basement drywall, he started putting in the framing for the under-stairs cubby hole, where there'll be a small bookshelf that I picked up from Ikea on Sunday.
And the insulation guys installed the rigid polyisocyanurte on the crawlspace concrete walls, including a medium density spray foam over the sole plate to ensure a nice tight seal. It'll be cozy warm in the Kayak Storage Facility for sure now. All that's left for them to do is the extra attic insulation that'll be blown in on Monday. (Remember? I have to finish pulling all that cable by then....will I make it? BottleRockit has a rare mid-day gig on Sunday, a repeat appearance at a beach house on Lake Goodwin by Kayak Point. That'll get in the way of finishing the cable running. I guess I may have to take some time off on Friday.
Red letter day for tennis tonight by the way- Midori and I beat John and Barbara for the first time. John is like a 4.5; Midori and I are like maybe 3.0 on a good day, something less than that usually. So taking a set against John felt, well, pretty darn awesome.
That's it for now- all coming to you from the blackberry tonight; left the laptop at the office. C
_________________________________________________
This message is private or privileged. If
you are not the person for whom this message
is intended, please delete it, notify me
immediately, and do not copy or send this
message to anyone else.
It really is unfortunate there aren't any affordable options that are also as highly durable. It's the one thing about our project that is bleedingly non sustainable. But it sure looks good!
The missing drywall piece is there because that's the place to which I need to run that pesky extra cat-5 cable. I have it all bundled now and I'm going there early in the morning to "Get 'er done!"I finally made it to Ikea to get the cabinet order squared away- it looks like everything is on the shelf there ready for pickup and assembly- there's just one glitsch. The wall where the wall-oven and pantry will go is an inch too short of being wide enough. Unfortunately Ikea's cabinet dimensions are a little less flexible, and I can't get a pull-out pantry any thinner than 15 inches. So I've asked Pete to see what he might come up with. It seems adding an inch of drywall to the end wall would be okay, and maybe we do it with a step in the wall so it doesn't mess up the switch plates. I'll let you know.
I'm on a train to Portland now, the project team from work is heading down to Oregon Health Sciences University to see the installation of a wastewater membrane bio-reactor, because we're considering it seriously for our project in Seattle. It takes the raw sewage from the building and through a series of filters and biological chambers, converts it to Class A potable water. Sort of like a large scale version of the Fremen's stillsuit. Only we're not going to make people drink it. Maybe.
What a great way to travel though- relaxed, spacious, scenic, and cheap. It's not that much slower than flying to Portland when you factor arrival time, security check, etc.
I sure hope the flooring guys don't puncture any of the hydronic heat lines today! Talk with ya'll later.
Martin from work just sent me some photos of his evening activity today; paragliding on Cougar Mountain. He just started recently, but he's totally into it. Now that looks awesome!