At least it's out of the box! I'm hoping Ray will be there tomorrow, and the portapottie will be gone. Keep your fingers crossed.Thursday, September 25, 2008
It's Almost Flushable!
At least it's out of the box! I'm hoping Ray will be there tomorrow, and the portapottie will be gone. Keep your fingers crossed.Wednesday, September 24, 2008
More Inching, While The Themometer Drops
As expected, Steve put all his efforts today into the tile installation in the main floor bathroom. The photo gives the impression that he finished, but he's still got the left wall of the tub and about half the door wall to go. But it sure looks good in this photo, doesn't it? Meanwhile, Pete was mudding away again when H and I dropped by in the evening, and it's all getting very very smooth right now. Hopefully, this weekend, we'll be painting away down there. That would be awsome.
And it's really getting cold lately. H had the little space heater on this morning, with the toaster on and the electric tea kettle when all of a sudden it all stopped working. She was really tempted to get serious about getting some fuel oil for the heating system here in teh rental house. A moment of weakness no doubt. So far she's convinced to remain steadfast, and we've got sweaters on tonight. Makes us that much more motivated to get the house finished, and that would be a very good thing.
Tuesday, September 23, 2008
Inching Visibly Closer To Home in the Bathrooms
Pretty soon, maybe by Thursday, I think Steve's going to have Ray the Plumber come down and hook up the Toto toilet, the tub, and the sink in the basement bathroom. With the floor tile installed yesterday, Steve put all the yellow tile on the walls today, so it'll all be ready for grouting tomorrow. It's looking more and more like a real house again. I'll have to get the wall sconces for the kids' bathroom quickly.He must've taken most of the day to do that,
plus put the wall mounted electrical boxes in for the upstairs bathroom for those sconces, because the only tile up there is just the ones directly centered on the sink, which as you can see he carefully lined up precisely on the center. Being an architect you know, that whole centered thing is critical.In other developments, the plastic laminate sample came today, and my initial reaction was not one of overwhelming acceptance. So I pulled a few more swatches just to see if anything else would stick, and we'll go by the house tonight to see. I ordered larger samples of each one just in case. No progress has been made on the kitchen, Pete's been diligently plugging away at the basement drywall mudding, and it's inching closer and closer, sometimes asymtotically it seems, to being finished.
Chillin'
Monday, September 22, 2008
Steve the Tile Layer
_________________________________________________
This message is private or privileged. If
you are not the person for whom this message
is intended, please delete it, notify me
immediately, and do not copy or send this
message to anyone else.
Sunday, September 21, 2008
At Solstice; The Four Month Mark



Colorful Saturday
_________________________________________________
This message is private or privileged. If
you are not the person for whom this message
is intended, please delete it, notify me
immediately, and do not copy or send this
message to anyone else.
Thursday, September 18, 2008
Zigurat; From Concept to Reality
By the time I got home in the evening, Steve had done quite a bit. He's fast.
And tonight being Thursday, the newly established tradition of the weekly visit to Tempero do Brasil occurred again, much to my personal delight. I'm working my way through the menu, and tonight it was Camarao Alho Oleo, which actually has tildees all over it so it's not really spelled corrctly here, but it's shrimp with garlic and olive oil, and it was fabulous. Heather had what's become the "Heather Plate", consisting of Bolinho de Bacalhau, collard greens, rice, beans, and manioc flour with *bacon*, and you know how I feel about bacon. Yum.Ciao for now
Wednesday, September 17, 2008
Let's Click.
Tuesday, September 16, 2008
Productive Tuesday
Regarding the stairs, Heather and I had one of those discussions last night as she finally started to understand the nature of the deck and stairs that I had designed. She took issue with their proximity and what would be between them. I, in my architecture focused brain, just thought we could do a Monty Python shrubbery between them. Once Heather saw the installation, she thought it would be better to make one of those big wide stairs that turn the corner. They look like the plinth at the Parthenon or Temple of Zeus; in this case there'd be seven steps.
So to further the discussion (we needed to get to a conclusion on this), I started drawing what that would look like on the butcher paper on the floor that's covering the wood floor, and a second sketch showing what I had planned. (Click on photo left.)
We ended up concluding that the conjoined stairs would be good, but instead of standard width stair treads, we'd skip every other riser and make wider treads, so they'd be a good size to hold potted plants and also serve as a bench. I left Steve a note on the plans "STEVE; LOOK AT THE DRAWING ON THE FLOOR!" It actually took him a couple hours to notice it; I got his voicemail that he understood it fine sometime around 10:30AM.Here's a shot of that privacy wall from the yard looking back at the house, showing clearly the stair that goes down towards the basement stairs - you can almost see the other stair going to the west, towards the future garage.

doghouse is the dishwasher that was finally delivered today. And this last photo is the little extra piece of sheetrock that Steve put around the opening to the stairs that I asked for - it allows the wall paint to turn the corner and stop so the ceiling color can start.
He worked a lot on the drywall around the stair today, and there you have it.Heather had dinner with her friend Ulricha from work; I guess we're invited to her house for dinner on Friday night. I'm looking forward to it!
Ciao!
Monday, September 15, 2008
Deck Started!!!!
Viewing from the side, you can see that the eave projection covers the Nanawall well. The elongated posts will support the trellis that will extend the roof line out over the deck.Sunday, September 14, 2008
A Ghost
Saturday, September 13, 2008
Easy As Phishin'!
But it had to be done this weekend, so I set the alarm for 5:45. To beat the heat, I planned to get there at 6:00 AM, before the sun comes up and starts to warm it all up. I don't have a haz-mat bunny suit, so I donned a turtleneck and cotton sweats with my hiking boots. (Stylish!). I had the heavy duty breathing mask, too, though I opted to not go for the full respirator. To top off my head, I had the LL Bean integral headlight cap- what a fabulous piece of gear. It worked perfectly; didn't need the flashlight.
I had purchased some knee pads a couple weeks ago to do the waterproofing installation, so I climbed up there "armed" ("kneed") to the teeth with those, and started the crabwalk through the darkness. The access hatch is right next to the new skylight, which was lined at my request with R-30 batts, which are almost a foot thick. I couldn't get around ot without rubbing my whole body against the batts, so I just pulled them all out so I could get where I needed to go.
As I rounded the corner, my headlamps shone on the massive tangled pile of blue cable lying on top of the insulation over the new entry closet. What a pile of spaghetti. So I tangled and twisted my limbs around midst the roof jacks, joist tops, and collar ties just to untangle all the cable so I could separate the three strand that need to go to three different locations. that took a little while, but all in all less than I thought. And fortunately, the knee pads were doing their job pretty well, and I found that I could sit comfortably on the big vent pipe that Ray the Plumber had put up there way back in June.
Once untangled, cable number one had to be poked down into the stud cavity by the new wall oven. The two speaker cables I poked up there a few weeks ago indicated the exact location I needed to poke through with this one. The building code today requires that any hole into the attic be plugged up with insulation, to prevent hot gases from getting into the attic space in case of fire. To pass inspection, Pete had filled up all the cable holes with a spray foam stuff that I now needed to somehow open up for the new cable. And I didn't have anything to poke at it with. So I manipulated the speaker wires that were in the hole, moving them around from side to side, trying to enlarge the hole, and I eventually was able to poke it on through, without too much effort. One down, two to go.
The next one was going to be a challenge. It was right next to the skylight shaft, and the framing at its base for some reason was double studs thick, and I knew from running the cabe before that I couldn't come down in the same spot as the existing ones because those turn sideways, go through another stud, before ending up at the electrical box. Now that the walls are all covered up below, that wouldn'r be possible. So I had to guess- and cross my fingers- that the place I think I needed to drill a new hole would actually be in the right place. (I did that once before in my previous house and ended up drilling into a camera bag that was in my closet!). This time, I lucked out. The drill I brought up went through the double studs like a hot knife through butter, it didn't feel like I hit anything nasty, and I poked the cable through into what I hoped would be the spot right above the targeted electrical box. I had to wait to see how close I came once I poked the third cable through.
Third cable, no problem, and by then I had the hang of crab-walking from joist to joist. No poke-throughs with my feet, and as I exited the space, I replaced the R-30 batts on the skylight shaft.
The trick really came down to whether or not I could actually get the cable all the way into the wall box - especially the one by the skylight. The others all had some accessibility from an unfinished back wall- but that one was totally enclosed. So I unwound all the cable already in the box and snapped open one of the prts in the back, and there it was - just sitting there like I had planned it and executed it like a pro. I used my fish tape to snag it in a matter of seconds, pulled it through the port, and all became right with the world. All wired up for sound; now all we have to do is find the money to buy the components!
Most of this was written at the Majestic Bay Theater while waiting for the new Coen Brothers' movie to start- all of it on bberry. My thumbs are sore. ;-)
Thursday, September 11, 2008
The Fabulous Finishes Foragers
They got everything selected, from paint colors to the additon of grasscloth to our palette, and a change to the kitchen tile countertop laminate! (Good think I didn't order those yet!) It's going to be beautiful.
(Another post directly from email right after shooting the shot.)
Wednesday, September 10, 2008
Lightwell & Daltile & Stairs- Oh My!
Meanwhile, I went to the Daltile place and picked up most of the bathroom tile, all except the basement's floor tile- that'll come on the 18th. The tile I did bring home is now stacked up in Kian's room ready and waiting for Steve to start the installation.
And as Pete's working his way through the basement drywall, he started putting in the framing for the under-stairs cubby hole, where there'll be a small bookshelf that I picked up from Ikea on Sunday.
And the insulation guys installed the rigid polyisocyanurte on the crawlspace concrete walls, including a medium density spray foam over the sole plate to ensure a nice tight seal. It'll be cozy warm in the Kayak Storage Facility for sure now. All that's left for them to do is the extra attic insulation that'll be blown in on Monday. (Remember? I have to finish pulling all that cable by then....will I make it? BottleRockit has a rare mid-day gig on Sunday, a repeat appearance at a beach house on Lake Goodwin by Kayak Point. That'll get in the way of finishing the cable running. I guess I may have to take some time off on Friday.
Red letter day for tennis tonight by the way- Midori and I beat John and Barbara for the first time. John is like a 4.5; Midori and I are like maybe 3.0 on a good day, something less than that usually. So taking a set against John felt, well, pretty darn awesome.
That's it for now- all coming to you from the blackberry tonight; left the laptop at the office. C
_________________________________________________
This message is private or privileged. If
you are not the person for whom this message
is intended, please delete it, notify me
immediately, and do not copy or send this
message to anyone else.
Ninja Cable Runner
Steve (bless his heart) pre-drilled the cable holes for me per our discussion yesterday, and even put in a 1/2" copper pipe to show me where the hole was to run the cable from the Kayak Storage Facility into the floor framing. It was almost easy. I ended up making I think 6 in-and-out trips to and from the crawlspace in order to start the cable pull, then pull it back due to a knot, restart it, then pull it back for incorrect routing reasons on the pull side (too close to the light fixtures, underneath the insulation instead of over it, etc. But in the end, I accomplished the Ninja Cable Mission by 7:20, after which I went home to shower and head off to work.
Ikea order is ready to be placed; maybe later today. We'll see. I have this weekend to run the cable in the ceiling. On Monday, the insulation guys come back to blow mass quantities of insulation into the attic. It'll be like a blizzard hit it, only it'll be all fluffy and warm instead of freezing and wet.
Tuesday, September 9, 2008
First Coat, Mega Fumes & Basement Drywall
It really is unfortunate there aren't any affordable options that are also as highly durable. It's the one thing about our project that is bleedingly non sustainable. But it sure looks good!
The missing drywall piece is there because that's the place to which I need to run that pesky extra cat-5 cable. I have it all bundled now and I'm going there early in the morning to "Get 'er done!"Entry Level
Wood Flooring Nears 90%
Monday, September 8, 2008
He's Baaa-aack
I finally made it to Ikea to get the cabinet order squared away- it looks like everything is on the shelf there ready for pickup and assembly- there's just one glitsch. The wall where the wall-oven and pantry will go is an inch too short of being wide enough. Unfortunately Ikea's cabinet dimensions are a little less flexible, and I can't get a pull-out pantry any thinner than 15 inches. So I've asked Pete to see what he might come up with. It seems adding an inch of drywall to the end wall would be okay, and maybe we do it with a step in the wall so it doesn't mess up the switch plates. I'll let you know.
I'm on a train to Portland now, the project team from work is heading down to Oregon Health Sciences University to see the installation of a wastewater membrane bio-reactor, because we're considering it seriously for our project in Seattle. It takes the raw sewage from the building and through a series of filters and biological chambers, converts it to Class A potable water. Sort of like a large scale version of the Fremen's stillsuit. Only we're not going to make people drink it. Maybe.
What a great way to travel though- relaxed, spacious, scenic, and cheap. It's not that much slower than flying to Portland when you factor arrival time, security check, etc.
I sure hope the flooring guys don't puncture any of the hydronic heat lines today! Talk with ya'll later.
Saturday, September 6, 2008
Sunny Backyard Photo
Five Bucks in One Day!
You guys did some serious ad-clicking since I last posted. Sorry I don't have any photos yet - the changes have been pretty subtle, though I'll post one of the newel posts later. It'll be a post-post post-post.
September 5, 2008; Pipe Disaster!!!
Evan Conkilin, the hydronic heat guy, says it's no big deal to fix the leak, and he'll send someone out tomorrow (Saturday) morning at 9:00 to fix it. Good thing all the ceiling wasn't installed in the basement yet, and only a small amount of the insulation got wet. And it's still pretty much bare concrete floors down there. All in all, it could have been much much worse.
Off to Ikea this morning to chase down the kitchen cabinets and some shelves, then BottleRockit has a gig in Vancouver at the big Sausagefest event at St. Joseph's Catholic Church; I guess it's a pretty big event according to Darren the Drummer who used to live there. They pay well, too - second biggest take for BottleRockit yet. What is it about Catholic churches and tubular meats? St. John's in Wallingford has the Wurst festival going on in a few weeks too. I grew up Catholic and the only tubular meat we had on a regular basis was the sliced up hot dogs in the beanie-weenies if you went for the hot lunch. Maybe it's a Vatican 3 thing.
Thursday, September 4, 2008
Prime Space
The bad news is that I looked over my notes on the stereo system wiring, and I see that I didn't put in enough cat 5 cable. I was supposed to run a pair of cat 5s to each box, and I had only put in a single. Damn! So this weekend, Sunday afternoon I guess, I will try to get the extra cables run. It'll require some attic work (yuk), and drilling a couple extra holes here and there.
We got a postcard from Steve all the way from Mongolia!! He apparently wrote it shortly after he arrived there, and he mentions the Olympic games, but it only just arrived day before yesterday. Great picture of a yak pulling a cart with four little Mongolian kids in front of a yurt. Can't wait to hear about his adventure, which included some type of mountain trek.
Martin from work just sent me some photos of his evening activity today; paragliding on Cougar Mountain. He just started recently, but he's totally into it. Now that looks awesome!
That's it for tonight - I think I'll have the band members over before rehearsal at my place tomorrow night.
Keep clickin'!!
Tuesday, September 2, 2008
Monday, September 1, 2008
What Else? Labor on Labor Day
Here's a couple quick shots of the living/dining room; it's starting to look like a house again. And the heat! The heat! It's so warm in there now, and the water temp on the boiler appears to only be somewhere around 105 degrees. This is really going to be interesting to see how this works out. As I'm cleaning up, any spare insulation I find I throw it into the attic. I figure it never hurts to have more insulation up there, especially with all that heat we're generating with electricity. I still haven't heard "Boo" from the insulation sub since he returned from his vacation and after I left a couple messages. I should try him tomorrow just to close the loop. A guy could get a full time job being a Construction Manager for a single family home, I swear.Today, I got the 40 pound demo hammer instead of the 60 pounder, and it made all the difference in the world. I could actually manage it without feeling like I had to do the clean and jerk every time it poked through the slab. It was exhausting. But with the 40 pounder, that the guy said wasn't going to be effective for breaking up a slab, I was able to get the whole rest of the driveway chunked up in less than two hours. Record time.

So that left most of the day - from noon until about 5:30 for Heather and me to pull up the chunks and pile them up for the new patio. It was a full day of hauling chunks up hill, and double wheelbarrow loads from the back yard, taking bites out of the orca pile of dirt and moving them to the front yard. Labor, labor labor. Working in the front yard makes it possible for all the curious neighbors to stop by and make jokes about laboring on Labor Day. Of course, we laughed each time.
And we were able to build up the ground in front of the main entrance too, so the concrete stoop won't require 16 yards of concrete. Just 4 maybe. Here's a 'Before & After" shot, the left one taken on Saturday after I put on the waterproofing and protection board, and the right one taked this morning.
Pete put in a full day today too, more coats of mud on the drywall, making it smoother and smoother. He really is a craftsman - and the corners are all crisp and true. Having done my share of D.I.Y drywall in the past, I have much appreciation for his work. It's looking real good. Tomorrow it's back to work - more labor after all the laboring over the weekend.
Saturday, August 30, 2008
Movin' Dirt & Waterproofing
layer of Tremco Paraseal, a Bentonite waterproofing product on all the front concrete walls. To fasten it to the concrete, I got to use a Hilti powder activated fastening gun, firing small explosive charges
with inch and a quarter nails, about six inches on center all over the dang place. Pow, pow, pow all day long. (Owhrr, owhrr, owhrr!) After that, I put a layer of drainage mat/protection board over it to keep the backfill from damaging the Bentonite and to let water wick away from the wall. The photo below shows both condtions; on the left is the Bentonite with the fasteners all over it holding it to the wall; on the right it's been covered with the drainage mat. That's a chunk of concrete in the middle of it all.
So after all the bang bang bang, Heather and I spent the rest of the day hauling dirt and chunks of concrete from all over the back yard to pile it all up against the house for the patio and entry stoop. The ground level is getting up there slowly but surely, tomorrow we'll be doing it again.

I was also able to get the same two-layer waterproofing system installed on outer wall of Daniel's room where he garage door used to be. By then, Pete had shown up and was slapping up more mud on the drywall. He had never seen these high falootin' products before, so it was all new to him. Friday, August 29, 2008
W00-H00!!! Warm as Toast!!!
to see if he could make it stay at a certain temperature until he came back in the morning, instead of going to the lower night time temperature. Thursday, August 28, 2008
We Got Heat!
Wednesday, August 27; Fire 'Er Up, Boys!
So I put the thermostat wires together, flipped the pump breaker on, heard everything click into gear, and flipped on the boiler breaker and switches, and waited for the water temperature to start climbing.
And I waited. And waited. Nothing. Called Even Conklin; he said it could be an electrical issue. Called Sparky; we agreed it wasn't an electrical issue. Called Evan back, and he was going to send out Anthony (the Adam Sandler look-alike) to come out on Thursday.
Keep your fingers crossed; we're going into the cool season and there ain't no backup to this system,..... I'm sure it'll be fine. :-)
Wednesday, August 27, 2008
Tuesday, August 26, 2008
Wetness Outside, & Some Inside
I know what you're thinking: "What the heck is that?" Don't blame ya. Looks like a wet streak on the basement floor. It is, sort of - it's a drying wet streak, where Pete put down the self-levelling concrete, a very viscous cementitious mixture that seeks its own level so that the floor is nice and flat. Problem is, there's flatness and there's levelness. Stuff can be flat without being level. We're going for flatness here since the floor is all catywompus and it's really the best we can reasonably hope for. When the cementitious stuff seeks its own level, it flows into areas Pete wasn't thinking it would flow into, so he's having to use more stuff than he anticipated.And more drywall work big time upstairs, including mudding in the bathroom. Pete's really sticking to the mission to get the upstairs ready for us as soon as possible.
Since it was raining like a cow peeing on a flat rock tonight, we decided to check out a movie at The Crest; "Mongol", the story of how Genghis Kahn became who he was from the ripe old age of nine when he selected his bride, to the beginnings of the most powerful army of all time. Check it out.