By the time I got home in the evening, Steve had done quite a bit. He's fast.
And tonight being Thursday, the newly established tradition of the weekly visit to Tempero do Brasil occurred again, much to my personal delight. I'm working my way through the menu, and tonight it was Camarao Alho Oleo, which actually has tildees all over it so it's not really spelled corrctly here, but it's shrimp with garlic and olive oil, and it was fabulous. Heather had what's become the "Heather Plate", consisting of Bolinho de Bacalhau, collard greens, rice, beans, and manioc flour with *bacon*, and you know how I feel about bacon. Yum.
Regarding the stairs, Heather and I had one of those discussions last night as she finally started to understand the nature of the deck and stairs that I had designed. She took issue with their proximity and what would be between them. I, in my architecture focused brain, just thought we could do a Monty Python shrubbery between them. Once Heather saw the installation, she thought it would be better to make one of those big wide stairs that turn the corner. They look like the plinth at the Parthenon or Temple of Zeus; in this case there'd be seven steps.
So to further the discussion (we needed to get to a conclusion on this), I started drawing what that would look like on the butcher paper on the floor that's covering the wood floor, and a second sketch showing what I had planned. (Click on photo left.)
We ended up concluding that the conjoined stairs would be good, but instead of standard width stair treads, we'd skip every other riser and make wider treads, so they'd be a good size to hold potted plants and also serve as a bench. I left Steve a note on the plans "STEVE; LOOK AT THE DRAWING ON THE FLOOR!" It actually took him a couple hours to notice it; I got his voicemail that he understood it fine sometime around 10:30AM.
doghouse is the dishwasher that was finally delivered today. And this last photo is the little extra piece of sheetrock that Steve put around the opening to the stairs that I asked for - it allows the wall paint to turn the corner and stop so the ceiling color can start.
He worked a lot on the drywall around the stair today, and there you have it.
Viewing from the side, you can see that the eave projection covers the Nanawall well. The elongated posts will support the trellis that will extend the roof line out over the deck.But it had to be done this weekend, so I set the alarm for 5:45. To beat the heat, I planned to get there at 6:00 AM, before the sun comes up and starts to warm it all up. I don't have a haz-mat bunny suit, so I donned a turtleneck and cotton sweats with my hiking boots. (Stylish!). I had the heavy duty breathing mask, too, though I opted to not go for the full respirator. To top off my head, I had the LL Bean integral headlight cap- what a fabulous piece of gear. It worked perfectly; didn't need the flashlight.
I had purchased some knee pads a couple weeks ago to do the waterproofing installation, so I climbed up there "armed" ("kneed") to the teeth with those, and started the crabwalk through the darkness. The access hatch is right next to the new skylight, which was lined at my request with R-30 batts, which are almost a foot thick. I couldn't get around ot without rubbing my whole body against the batts, so I just pulled them all out so I could get where I needed to go.
As I rounded the corner, my headlamps shone on the massive tangled pile of blue cable lying on top of the insulation over the new entry closet. What a pile of spaghetti. So I tangled and twisted my limbs around midst the roof jacks, joist tops, and collar ties just to untangle all the cable so I could separate the three strand that need to go to three different locations. that took a little while, but all in all less than I thought. And fortunately, the knee pads were doing their job pretty well, and I found that I could sit comfortably on the big vent pipe that Ray the Plumber had put up there way back in June.
Once untangled, cable number one had to be poked down into the stud cavity by the new wall oven. The two speaker cables I poked up there a few weeks ago indicated the exact location I needed to poke through with this one. The building code today requires that any hole into the attic be plugged up with insulation, to prevent hot gases from getting into the attic space in case of fire. To pass inspection, Pete had filled up all the cable holes with a spray foam stuff that I now needed to somehow open up for the new cable. And I didn't have anything to poke at it with. So I manipulated the speaker wires that were in the hole, moving them around from side to side, trying to enlarge the hole, and I eventually was able to poke it on through, without too much effort. One down, two to go.
The next one was going to be a challenge. It was right next to the skylight shaft, and the framing at its base for some reason was double studs thick, and I knew from running the cabe before that I couldn't come down in the same spot as the existing ones because those turn sideways, go through another stud, before ending up at the electrical box. Now that the walls are all covered up below, that wouldn'r be possible. So I had to guess- and cross my fingers- that the place I think I needed to drill a new hole would actually be in the right place. (I did that once before in my previous house and ended up drilling into a camera bag that was in my closet!). This time, I lucked out. The drill I brought up went through the double studs like a hot knife through butter, it didn't feel like I hit anything nasty, and I poked the cable through into what I hoped would be the spot right above the targeted electrical box. I had to wait to see how close I came once I poked the third cable through.
Third cable, no problem, and by then I had the hang of crab-walking from joist to joist. No poke-throughs with my feet, and as I exited the space, I replaced the R-30 batts on the skylight shaft.
The trick really came down to whether or not I could actually get the cable all the way into the wall box - especially the one by the skylight. The others all had some accessibility from an unfinished back wall- but that one was totally enclosed. So I unwound all the cable already in the box and snapped open one of the prts in the back, and there it was - just sitting there like I had planned it and executed it like a pro. I used my fish tape to snag it in a matter of seconds, pulled it through the port, and all became right with the world. All wired up for sound; now all we have to do is find the money to buy the components!
Most of this was written at the Majestic Bay Theater while waiting for the new Coen Brothers' movie to start- all of it on bberry. My thumbs are sore. ;-)
They got everything selected, from paint colors to the additon of grasscloth to our palette, and a change to the kitchen tile countertop laminate! (Good think I didn't order those yet!) It's going to be beautiful.
(Another post directly from email right after shooting the shot.)
Meanwhile, I went to the Daltile place and picked up most of the bathroom tile, all except the basement's floor tile- that'll come on the 18th. The tile I did bring home is now stacked up in Kian's room ready and waiting for Steve to start the installation.
And as Pete's working his way through the basement drywall, he started putting in the framing for the under-stairs cubby hole, where there'll be a small bookshelf that I picked up from Ikea on Sunday.
And the insulation guys installed the rigid polyisocyanurte on the crawlspace concrete walls, including a medium density spray foam over the sole plate to ensure a nice tight seal. It'll be cozy warm in the Kayak Storage Facility for sure now. All that's left for them to do is the extra attic insulation that'll be blown in on Monday. (Remember? I have to finish pulling all that cable by then....will I make it? BottleRockit has a rare mid-day gig on Sunday, a repeat appearance at a beach house on Lake Goodwin by Kayak Point. That'll get in the way of finishing the cable running. I guess I may have to take some time off on Friday.
Red letter day for tennis tonight by the way- Midori and I beat John and Barbara for the first time. John is like a 4.5; Midori and I are like maybe 3.0 on a good day, something less than that usually. So taking a set against John felt, well, pretty darn awesome.
That's it for now- all coming to you from the blackberry tonight; left the laptop at the office. C
_________________________________________________
This message is private or privileged. If
you are not the person for whom this message
is intended, please delete it, notify me
immediately, and do not copy or send this
message to anyone else.
It really is unfortunate there aren't any affordable options that are also as highly durable. It's the one thing about our project that is bleedingly non sustainable. But it sure looks good!
The missing drywall piece is there because that's the place to which I need to run that pesky extra cat-5 cable. I have it all bundled now and I'm going there early in the morning to "Get 'er done!"I finally made it to Ikea to get the cabinet order squared away- it looks like everything is on the shelf there ready for pickup and assembly- there's just one glitsch. The wall where the wall-oven and pantry will go is an inch too short of being wide enough. Unfortunately Ikea's cabinet dimensions are a little less flexible, and I can't get a pull-out pantry any thinner than 15 inches. So I've asked Pete to see what he might come up with. It seems adding an inch of drywall to the end wall would be okay, and maybe we do it with a step in the wall so it doesn't mess up the switch plates. I'll let you know.
I'm on a train to Portland now, the project team from work is heading down to Oregon Health Sciences University to see the installation of a wastewater membrane bio-reactor, because we're considering it seriously for our project in Seattle. It takes the raw sewage from the building and through a series of filters and biological chambers, converts it to Class A potable water. Sort of like a large scale version of the Fremen's stillsuit. Only we're not going to make people drink it. Maybe.
What a great way to travel though- relaxed, spacious, scenic, and cheap. It's not that much slower than flying to Portland when you factor arrival time, security check, etc.
I sure hope the flooring guys don't puncture any of the hydronic heat lines today! Talk with ya'll later.
Martin from work just sent me some photos of his evening activity today; paragliding on Cougar Mountain. He just started recently, but he's totally into it. Now that looks awesome!
Here's a couple quick shots of the living/dining room; it's starting to look like a house again. And the heat! The heat! It's so warm in there now, and the water temp on the boiler appears to only be somewhere around 105 degrees. This is really going to be interesting to see how this works out. As I'm cleaning up, any spare insulation I find I throw it into the attic. I figure it never hurts to have more insulation up there, especially with all that heat we're generating with electricity. I still haven't heard "Boo" from the insulation sub since he returned from his vacation and after I left a couple messages. I should try him tomorrow just to close the loop. A guy could get a full time job being a Construction Manager for a single family home, I swear.
Pete put in a full day today too, more coats of mud on the drywall, making it smoother and smoother. He really is a craftsman - and the corners are all crisp and true. Having done my share of D.I.Y drywall in the past, I have much appreciation for his work. It's looking real good. Tomorrow it's back to work - more labor after all the laboring over the weekend.
layer of Tremco Paraseal, a Bentonite waterproofing product on all the front concrete walls. To fasten it to the concrete, I got to use a Hilti powder activated fastening gun, firing small explosive charges
with inch and a quarter nails, about six inches on center all over the dang place. Pow, pow, pow all day long. (Owhrr, owhrr, owhrr!) After that, I put a layer of drainage mat/protection board over it to keep the backfill from damaging the Bentonite and to let water wick away from the wall. The photo below shows both condtions; on the left is the Bentonite with the fasteners all over it holding it to the wall; on the right it's been covered with the drainage mat. That's a chunk of concrete in the middle of it all.

I was also able to get the same two-layer waterproofing system installed on outer wall of Daniel's room where he garage door used to be. By then, Pete had shown up and was slapping up more mud on the drywall. He had never seen these high falootin' products before, so it was all new to him.
to see if he could make it stay at a certain temperature until he came back in the morning, instead of going to the lower night time temperature.
I know what you're thinking: "What the heck is that?" Don't blame ya. Looks like a wet streak on the basement floor. It is, sort of - it's a drying wet streak, where Pete put down the self-levelling concrete, a very viscous cementitious mixture that seeks its own level so that the floor is nice and flat. Problem is, there's flatness and there's levelness. Stuff can be flat without being level. We're going for flatness here since the floor is all catywompus and it's really the best we can reasonably hope for. When the cementitious stuff seeks its own level, it flows into areas Pete wasn't thinking it would flow into, so he's having to use more stuff than he anticipated.
To my surprise, the recessed ceiling lights were in operation for the first time! You could see them through the front patio door (see top photo). Sparky had put in one light switch for those fixtures just before he left apparently, and Pete was taking advantage of it. Odd that I didn't notice it earlier.
and fortunately Danny and I put down the biggest concrete chunks on top of it all to keep any of it from blowing away in all the strormy conditions.Kian, home from summer camp after three weeks in the deep woods, saw the house for the first time in about a month, and for a guy who's pretty typically non-plussed about everything, he let on just a little bit of surprise at the big old Nanawall and some satisfaction with the Man-Cave. I think he's really looking forward mostly to the idea of the media room and the speakers around the house. It's a guy thing, I'm sure.
That's it for tonight. Pretty quiet except for Pete's drywall cranking; hope to see more tomorrow!
since we're trying to decide how much tile to put on the walls and if there needs to be any additional color striping. I think we agreed on some things using the model, but we still have a little more work to do this week. Soon, too, because Pete's really cranking on the drywall work. He'll be ready for finishes soon.
The concrete basement wall sticks out a little further than the framed wall above, and then there's the slope of the ceiling that angles down, and the joists that need to be covered up with wallboard or wood trim, and the opening I want to keep into Kian's "Man Cave" from the stairs, and the handrail that needs to go down the stairs. Oy! Just listing all the stuff to do makes me want to stay up all night and work on it. Not.
I started early by going in to check all of the perimeter insulation in the floor joist cavity - my earlier investigations gave me little confidence things were okay. Sure enough, the first area I looked at had the heat tubes up against the rim joist with no insulation separating them (see first photo). That means if you had an infrared goggles this winter and you looked at the house, there'd be a bright red spot right at the floor line where lots of precious heat would be emanating through the wood. There were a couple of spots like that, and a couple spots where I was looking out through small holes to the inside face of the Tyvek (that stuff that Nascar prefers), so I foamed them up real good and put the batts lovingly back into place.
I took off some of the insulation to inspect, I saw that he had a line of grounding wire running diagonally through the ceiling of the Man Cave, and one of the holes drilled in the joist was made in a way that separated the diagonal bridging from the joist on both sides! (See next photo, showing copper cable and dangling bridging) I nailed the bridging back into place; don't know why it wasn't done earlier. I started all the insulation inspecting at 6:00 and finished the "repairs" by 10:30 pretty much on schedule.
the concrete rubble stacked up in the front yard as filler, on which that giant orca-sized dirt pile in the back will provide additional fill, to build up for the front yard patio (a.k.a. "Breakfast Deck"). Daniel joined in the fun about noonish, and together the three of us worked on stacking alternate layers of dirt and rubble to make an earthwork lasagne (without the cheese).
By about 3:30 the three of us were all just dragging our heinies because of the heat, but Judy (of the Jack & Judy hip roof and large windowed house down the street) came in for a brief tour (mostly to see the Nanawall of course). When she left, she was able to join the Thumbs Up Crowd too. Check out that shirt. We seem to be providing a pretty fair amount of entertainment for some of the neighbors. Richard came by while I was using the 60 pound mother of all demo hammers, sticky sweaty and barely able to lift the thing out of the pavement after it drilled through it like a hot knife through butter. He was talking about using it in the basement to lower the slab height someday. Oy! The worst thing is, we wouldn't get to watch him if he's in the basement.
At the end of the day, we are just totally exhausted from moving dirt and rubble, amazed at how Pete and Steve can just bang out this kind of work day after day, and on weekends they go on thousand mile long bicycle rides - or hundreds of miles anyway. They are amazing. Danny and I drove by the house about 8:00 and Pete was still finishing up a few things. Long weekend day for the wicked, huh?